Programming

Run Wendler's 5/3/1 Program: Percentages, Cycles and Setup

Run Jim Wendler's 5/3/1 program: set your training max, follow the 3-week percentage wave, and add the AMRAP sets and deload week that make it work.

Powerlifter squats with a loaded barbell in a power rack in a dark gym with red accent light

Run Jim Wendler's 5/3/1 program on your squat, bench press, deadlift and overhead press by setting a training max at 90 percent of your true 1 rep max, then working through a 3-week wave of 65 to 95 percent of that number before a deload week resets you. The last set of each week is an AMRAP, as many reps as you can, so the program still tests you even while the percentages stay deliberately conservative. This guide walks you through the setup, the weekly percentages, and how to progress between cycles.

Set your training max first

Take 90 percent of your actual tested or estimated 1 rep max on each lift. Every percentage below is based on that submaximal number instead of your true max. The submaximal training max exists on purpose: it keeps your top sets genuinely achievable instead of grinding you down cycle after cycle. Calculate your training max and every week's percentages automatically with the 5/3/1 calculator instead of working out the math by hand each cycle.

Run the 3-week percentage wave

WeekSet 1Set 2Set 3 (AMRAP)
Week 1 (5s)5 reps at 65%5 reps at 75%5+ reps at 85%
Week 2 (3s)3 reps at 70%3 reps at 80%3+ reps at 90%
Week 3 (5/3/1)5 reps at 75%3 reps at 85%1+ reps at 95%

Every percentage above refers to your training max instead of your true 1 rep max. Push your AMRAP set, the final set marked with a plus, for as many clean reps as you can manage with good form.

See the math with a real example

Take a lifter with a 300 pound squat 1 rep max. Their training max is 90 percent of that, 270 pounds. Week 1 reads as 5 reps at 65 percent of 270 (about 175 pounds), 5 reps at 75 percent (about 200 pounds), then an AMRAP set at 85 percent (about 230 pounds) for as many reps as good form allows.

WeekTraining maxSet 1Set 2Set 3 (AMRAP)
Week 1270 lb175 lb x 5200 lb x 5230 lb x 5+
Week 2270 lb190 lb x 3215 lb x 3245 lb x 3+
Week 3270 lb200 lb x 5230 lb x 3255 lb x 1+
Week 4 (deload)270 lb110 lb x 5135 lb x 5160 lb x 5

Round every number to the nearest weight your plates allow. Exact decimals matter far less than hitting the AMRAP set with honest form.

Deload in week 4

Week 4 drops to 3 sets of 5 reps at 40, 50 and 60 percent of your training max. Run it every single cycle, even when you feel strong enough to skip it. The deload lets you recover and sets up the next cycle's training max increase.

Pick your 4 main lifts and assistance work

Build each session around one of your 4 main lifts: squat, bench press, deadlift or overhead press. Add assistance work afterward from a simple framework: one push movement, one pull movement, and one single-leg or core movement per session.

CategoryExample exercisesTypical volume
PushDips, incline press, push-ups50 to 100 total reps across a few sets
PullChin-ups, rows, lat pulldowns50 to 100 total reps across a few sets
Single-leg or coreLunges, step-ups, planks, leg raises2 to 3 sets of 10 to 20

Wendler's own material calls higher-volume pressing and pulling assistance "Boring But Big," and the name is the point: assistance work should build volume without competing for your energy with the main lift's heavy sets. Keep assistance loads moderate and leave your heaviest effort for the 3 main sets above.

Progress your training max between cycles

Add 5 pounds (about 2.5kg) to your training max on the overhead press and bench press, and 10 pounds (about 5kg) on the squat and deadlift, after you finish a full 4-week cycle including the deload. Skip the increase on any lift where your AMRAP sets stalled or dropped compared to the previous cycle, and repeat that cycle's training max instead.

Schedule your training days

Spread the 4 main lifts across 3 or 4 sessions a week, with at least one rest day between sessions that hit the same lift hard.

ScheduleTypical order
4 days a weekOverhead press, deadlift, bench press, squat, one per day
3 days a weekRotate the 4 lifts across 3 sessions, so each lift lands on a different weekday from cycle to cycle

A 4-day week keeps each session shorter and more focused. A 3-day week fits a busier schedule but asks you to track which lift falls where as the rotation shifts.

Avoid these common 5/3/1 mistakes

MistakeWhat happensFix
Setting your training max from a maxed-out 1RMEvery week's top set feels like a grind from day oneTest or estimate your 1RM on a day you feel fresh, then still take 90 percent of it
Skipping the deload weekFatigue builds across cycles until a lift stallsRun the deload every cycle, even one that feels easy
Chasing AMRAP reps with broken formYou add reps the program did not actually earnStop the set the moment your form breaks, even one rep short of a number you wanted
Increasing your training max after a stalled cycleThe next cycle starts from a number you cannot really hitRepeat the same training max until your AMRAP sets improve again

Our how to start powerlifting guide covers the 3 competition lifts in full if you are new to the sport before you commit to any specific program, and powerlifting RPE explains the effort-based alternative to Wendler's fixed percentages if you want to compare approaches.

Common questions

Is 5/3/1 good for beginners?

5/3/1 works best once you already have a reasonably accurate 1 rep max and have trained the main lifts for a few months. Total beginners often progress faster on a simpler linear program before switching to 5/3/1's slower, cycle-based progression.

How do you calculate your training max for 5/3/1?

Take 90 percent of your true or recently tested 1 rep max on each lift. Round to a number you can load easily with the plates available to you.

What does the plus sign mean in 5/3/1?

A plus after a rep number marks an AMRAP set: perform as many clean reps as you can beyond the stated number, stopping once your form starts to break down.

How often do you increase your training max?

Once per full 4-week cycle, including the deload week, and only on lifts where your AMRAP sets held up or improved. Repeat the same training max on any lift that stalled.